Skip to main content

Best Africa LogisticsShipping from China to Africa

BEST AFRICA LOGISTICS
Resources · Shipping basics

How shipping from China to Africa works

What a shipment goes through between a Chinese factory and the consignee in Africa, who handles each step and where it most often gets stuck, explained in one process table.

About 3 min readContent checked on

Short answer

A shipment from China to Africa usually passes through 7 stages: goods and documents, pickup and warehousing in China, export declaration, booking and loading, sea or air transport, clearance at the destination port, and final delivery. The sea leg takes the longest, but the least predictable parts are the declarations at both ends.

  • Sea-leg transit times are fairly stable: Lagos 30 to 38 days, Tema and Mombasa 28 to 35 days, Dar es Salaam 30 to 38 days.
  • How fast destination clearance goes mainly depends on complete documents, certificates being in place, and a declaration that matches the actual cargo.
  • Certification requirements (such as SONCAP in Nigeria or PVoC in Kenya) should be handled before shipping; fixing them after arrival is usually slower and more expensive.

Information updated: 2026-10-03

What happens at each of the 7 stages

What happens at each of the 7 stages
StageMain workCommon sticking points
1. Goods and documentsConfirm description, quantity, material and use; prepare invoice and packing list; check whether certification is neededA vague description means rework at every later step
2. Pickup and warehousing in ChinaFactory delivers or the forwarder collects; the warehouse checks pieces, weighs and measuresPiece count doesn't match the packing list; cartons have no shipping marks
3. Export declarationDeclare to China Customs with the required data elements; assist with inspection if neededDescription doesn't match the goods; sensitive items not truthfully declared
4. Booking and loadingBook and stuff full containers; LCL goes to the consolidation warehouse for loadingOverbooking and rolled containers in peak season; missed cut-off
5. Main-leg transportBy sea or air to the destination port or airportDelays at transshipment ports; skipped port calls
6. Destination clearanceSubmit documents, pay duties, assist inspection, release and collect the containerMissing documents, valuation disputes, inspection queues, system outages
7. Final deliveryCollect and unstuff the container; self-pickup or door deliveryConsignee unreachable; road conditions to inland cities

Who is responsible for which part

Responsibility shifts with the trade term. Under FOB, the seller is responsible until the goods are loaded at the Chinese port. Under CIF, the seller also pays ocean freight and insurance, but the transport risk has already passed to the buyer at loading. Under DDP, the seller is responsible up to the door and pays the destination country's duties and taxes.

Many small and mid-sized African buyers choose "double clearance, duties included, to the door": one logistics provider handles both the Chinese export declaration and the import clearance in the destination country, with duties bundled into the freight. It saves effort, but the contract should state clearly which charges are included and which situations are billed separately.

How to keep the whole journey smooth

  • Before ordering, confirm whether the product can be shipped and whether it needs certification; don't wait until the goods are ready to check.
  • Keep the description, piece count and weight on the invoice and packing list consistent with the actual goods, and use one set of documents all the way through.
  • Put shipping marks on every carton. This matters most for LCL cargo, which is otherwise easily mis-sorted at the destination.
  • Leave a buffer: in peak season (roughly September to January) bookings are tighter and destination ports more congested.

If you're unsure how to prepare a step, send the product description, quantity and destination city to your logistics provider and ask them to list what they need. It's faster than guessing.

Frequently asked questions

How long does shipping from China to Nigeria take overall?

By sea, usually around 40 to 55 days in total: 30 to 38 days at sea, with the rest spent on warehousing and export declaration in China and on clearance and delivery at the destination. Incomplete documents or an inspection make it longer.

How soon can the goods be collected after arrival?

Fairly quickly when documents are complete, duties are paid and there is no inspection; longer if an inspection or extra documents are needed. When Nigerian ports are congested, queuing time also has to be factored in.

Connect Africa & ChinaDeliver Opportunities

Best Africa LogisticsShipping from China to Africa

Still have questions? Send us the product name and destination city

Not sure what to send? A product name and your destination city are enough to start. We send a quote within 30 minutes, the same day.

WhatsApp / Phone (Nigeria)
Business hours
Mon to Sun, 2:00 - 17:00 Lagos time (WAT)
Lagos warehouse 1
No 2 Henry Carr Street, By Guinness Bus Stop, Ikeja, Lagos State 102212, Nigeria
Lagos warehouse 2
No. 5 Lateef Jakande Road, Agidingbi, Ikeja, Lagos State 101233, Nigeria
Head office, China
Ground Floor, Building 12, No.8 Tangwei Industrial Ave, Fuhai Subdistrict, Bao'an District, Shenzhen 518103, China
View on map
Goods category (select all that apply)
  • Mon to Sun, 2:00 - 17:00 Lagos time (WAT)
  • Free compliance check
  • Used only for this quotation